All Case Studies

Hungry Jack’s Wangara (WA)

During 2020 we worked with Vespoli Constructions on the brand new Hungry Jack’s store located in Wangara, Western Australia.

Our in-house Draftsman, Andrew Rae and Project Manager, Philip Carmichael worked together to ensure the design and installation of the main duct in the kitchen area went to plan.

We installed the Yanmar GPAC unit (Gas Powered Air Conditioning), this is the first time Hungry Jack’s have installed this technology in a store, ATCO Gas provided the mains gas line and our technician Ryan Ball installed the broiler and fryer canopies.

The Wangara site was our inaugural installation of CO2 monitors for Hungry Jack’s, we now provide and install the monitors to stores throughout Western Australia.

Our Installation Team

  • Mathew Foster – Air Conditioning Manager
  • Philip Carmichael – Project Manager
  • Ryan Ball – Technician
  • Mark Law – Apprentice
  • Andrew Rae – Draftsman

Images supplied by Hungry Jack’s

Case Study

Hungry Jack’s Wangara (WA)

1 Niche Parade,
Wangara WA 6065
Design and installation of main ducting
Yanmar gas powered air conditioning unit
Get Directions

You might be interested in

Get A Quote

Enquire today to receive more information about your chosen product.

Tip: You can enquire about multiple products by adding them to your products list. Click on save product to add a product to this list.

Your Enquiry

  • Hidden
  • This field is for validation purposes and should be left unchanged.